Our process · The PSW EDGE

Twelve steps. One clear path.

The PSW EDGE is how we take your property from the first call to the finished space: twelve steps in six stages, each one finished before the next begins.

Stages
Six, from vision to lifetime
Steps
Twelve, the PSW EDGE
During the build
One project manager
Building since
1979, Bridgeville, PA

Stop the chaos

The same five questions.

Building the space you've pictured is exciting: a fresh start for your family's story. It's also a lot of moving parts, and that's what holds many homeowners back.

Most people end up asking themselves the same things. Each one has an answer, and a step where you get it.

The PSW EDGE

Six stages, walked in order.

EDGE stands for Exceptional living through a Detailed process of Guidance and Education. Every person on the team has one role in it, and you'll always know who is leading the step you're in.

Each step ends with something you can hold: an agreement, a design, a price, a plan. Nothing moves on until the step before it is done.

Drawing: a first phone call, a video conversation with a project director, and a handshake at the property01Vision
Stage 01

Vision

You tell us what you want from the property.

  1. Step 1The Introduction

    Your first call is with our intake specialist, who learns who you are, what you're picturing and how we can help. Your details go to the project director who specializes in your kind of project.

    Intake specialist
  2. Step 2The Discussion

    Your project director calls for 30 to 60 minutes to go deeper into your vision, explain how the process works and answer your questions, then books a visit to the property.

    Project director
You leave with

A project director who knows your goals.

Drawing: the project director's visit and the Vision Agreement02Discovery
Stage 02

Discovery

We learn the property itself.

  1. Step 3The Visit

    Your project director walks the property with you to learn its layout, talk through your vision, and go over options and price ranges based on what you both see.

    When we agree the vision works for the land, for how you'll use it and for your budget, we write a Vision Agreement: our commitment to design your project to the property's real dimensions, with lifelike 3D renderings. They're not pretty pictures. They show what we plan to build.

    Project director
You leave with

A Vision Agreement.

Drawing: a 3D model of the house and pool, an itemized cost breakdown, and the design presented03Design
Stage 03

Design

The whole property, designed to scale.

  1. Step 4The Creation of the Vision

    Accuracy is where a good design starts. Vizyon Design Group measures the property and builds a detailed 3D model of your home and land, then works with your project director on a design drawn to scale and made for you.

    Vizyon design team
  2. Step 5The Cost Breakout

    We price the project only once the design exists. Because it's drawn to scale, every element can be measured and priced on its own line, so you see where every dollar goes.

    Project director
  3. Step 6The Presentation

    We walk you through the design, in person or online: every element and the thinking behind it, from any angle you want, with changes made as we talk. Your project director covers the cost and material options for each part. Nothing is set in stone yet.

    Project director and design team
You leave with

A 3D design and an itemized price.

Drawing: the contract signed, deliveries scheduled on a calendar, and the team meeting around a table04Preconstruction
Stage 04

Preconstruction

Everything settled before the ground is opened.

  1. Step 7The Signing

    Your project director prepares the contract: the full scope of work, the schedule, warranties and terms. You can review and sign it online. A retainer reserves your place on the construction schedule.

    Project director
  2. Step 8The Coordination

    Your Supply Chain Manager takes on the logistics: permits with your township and HOA, your material and product selections, deliveries, and the PA One Call to mark utilities. Coordination done early is what keeps a project from slipping later.

    Supply Chain Manager
  3. Step 9The Preparation

    About a week before the start, every specialist and trade partner on your project meets so everyone works from the same plan. You won't be in the room, but this is the step that keeps the build running smoothly.

    Specialists and trade partners
You leave with

Permits, selections and a start date.

Drawing: the layout marked out on site, and the project manager connecting every crew and material05Build
Stage 05

Build

One project manager, start to finish.

  1. Step 10The Layout

    Just before groundbreaking, your project manager introduces themselves. The designer walks the site and marks out every element of the project, and you review the layout and the construction schedule together.

    Project manager and designer
  2. Step 11The Creation

    From here, your project manager is your one point of contact, between you and every crew. Every project is built by PSW Trusted Trade Partners, chosen for their skill and reputation and held to the contract and to industry standards.

    Partway through, some parts may look out of place. They were chosen to work together, and they will once it's finished. Near the end, you walk the project with your project manager and the trade partners to list what's left.

    Project manager
You leave with

Your finished property, walked with you.

Drawing: a child jumping into the new pool while two glasses are raised06Lifetime
Stage 06

Lifetime

The project ends. The relationship doesn't.

  1. Step 12The Result

    Once the project is complete and paid in full, you're part of the PSW family. We take care of any warranty items, and we're here when you need us: for what comes next, or for a trusted partner for other work around your home.

    The PSW team
You leave with

A warranty, and a team you can call.

Step 1

Where do you start? Here.

Tell us about your property and what you want from it. Our Client Development Director will be in touch within one business day.