The brief
A pool house, and the pool before it.
It began as a renovation. The family wanted their 1970s pool updated and a small shed behind the house turned into a usable outdoor room. The shed was in worse condition than they realized, so it became a full pool house. They wanted to entertain, and they wanted room for their kids beyond the pool, with space for games and play.
The old pool, its flagstone deck and the shed came out. In their place went a new 18 × 36 ft pool, a 20 × 24 ft pool house at its far end, a flagstone patio and an outdoor shower, laid out to read as one yard with the house.
Scan
The yard, as we found it.
Before anything is drawn, we scan the yard with a Trimble LiDAR scanner. It records every grade, tree, wall and structure as millions of measured points, so the design starts from the ground as it really is rather than a tape measure and an estimate.
This yard was scanned on 13 June 2024, before any work began. The scan caught the back of the house, the old pool with its flagstone deck, the shed beside it and the trees that frame the lot.



- 01An old pool in the wayThe old pool and its deck sat where the new pool would go, so they had to come out first.
- 02A shed past savingThe old shed was in worse condition than the family realized, so a full pool house took its place.
- 03A near-level yardWith little fall across the lot, the pool, the patio and the pool house floor could sit close to one level.
Design
The pool house, before it existed.
VIZYON drew the pool, the pool house and the patio as one design: an 18 × 36 ft pool with a bench at the deep end and an auto cover, a 20 × 24 ft pool house that opens onto the pool through a folding glass wall, a raised planter with two copper scuppers, a flagstone patio and an outdoor shower.
The house is rustic, and its existing materials set the look. The pool house was designed to match them and to work within the style the house already had, down to shutters in the main house's hunter green.
The family saw it rendered, by day and by night, before the build began.
The clients were absolutely wonderful to work with, even their interior designer and I worked hand in hand. Ultimately, capturing the rustic aesthetic and having it resonate with the existing structure, then being able to see the final result was truly amazing.Rob Healy, Director of Design Integration, VIZYON




Render and reality
The same view, before and after.


Build
Built from August to June.
PSW started on site at the end of August 2024 and finished in early June 2025, about nine months through a Pittsburgh winter. The old pool, deck and shed came out first. The new pool was dug and poured by mid-October, and the pool house was framed, roofed and closed in before the cold set in. The inside was finished over the winter; the patio, the pool finish, the outdoor shower and the planting followed in spring.

Clearing the old yard
The old pool, its flagstone deck and the shed came out in the first two weeks, once the utilities to the old building were cut off.

The dig
The pool and the pool house footings were dug, through rock in places, and the forms set.

The pool shell
With the walls set, the pool floor was poured over a steel grid and the corner step was formed.

Foundation and utilities
Block walls rose on the pool house footings, and gas and electric ran underground from the house to the pool equipment.

Framing the pool house
The walls went up, then the roof, and the pool house was wrapped in the first week of November.

Siding and the glass wall
Vertical board siding went on, the folding glass wall was hung and the ceiling boards went up. The shutters were matched to the main house in hunter green.

The bar and the patio
Over the winter the inside came together: new power, heating and cooling, then the bar cabinetry and counters. Outside, the flagstone patio was set around the pool house.

The pool finish
The pebble finish went on with tile depth markers, then the coping and the patio joints.

Shower, gates and planting
Stone was set around the outdoor shower, the gates and screens were hung and the beds were planted. The last day on site was in early June.
Finished
The pool house, lived in.
The pool house faces down the length of the pool. Fold the glass wall back and the bar, the lounge and the patio become one room open to the water. Two copper scuppers spill from the raised planter, and at dusk the lanterns, the pool and the garden lights come on together.






Scan
VIZYON Design Group
Trimble LiDAR site capture
Build
PSW
Pool, pool house and landscape construction
Photography: Yousef Hassoud
More from the showcase
Earlier work.
Your project
Every project starts with the ground.
Tell us how you want to live outdoors. We will start with your yard as it is.