The new front entrance at dusk: steps, pavers and lit stone pillars
← Showcase

Scan · Design · Build

Koi Cove

Bridgeville, Pennsylvania · Completed summer 2026

Scope
Pool, spa, decks, patios, kitchen, pergola, fire pit, front entrance
Pool
Vinyl liner, 28 × 14 ft
Site
12.8 ft fall
Scan to finish
Jul 2025 – summer 2026
On site
Nov 2025 – summer 2026
Team
PSW · VIZYON

The brief

How the family wanted to live.

A couple and their young child, in Bridgeville. They needed more space to live in, and they wanted the yard to give it: an extension of the house, for entertaining, relaxing and everyday family time, with the existing pool at its heart.

The yard does not sit flat. Across the work area the ground falls 12.8 ft, and the lower lawn on the far side of the house sits 8.8 ft below the patio. That fall is what the scan had to capture before anything was drawn.

01

Scan

The ground, as we found it.

Before anything is drawn, we scan the yard with a Trimble LiDAR scanner. It records every grade, tree, wall and structure as millions of measured points, so the design starts from the ground as it really is rather than a tape measure and an estimate.

Rob Healy scanned this yard on 7 July 2025, before any work began. The scan caught the fall of the land, the house and the old pool, so the design could start from all three.

The point cloud of the property seen from above
The house and the yard before work began, from the air
A section through the scan: the back lawn, the existing pool, the house and the lower lawn, with the 12.8 ft fall
7 Jul 2025Scanned
33.5 millionPoints measured
12.8 ftFall across the yard
2 hoursOn site to scan
  1. 01The back lawn runs downhillIt falls 3.0 ft over 34 ft before it reaches the pool: about a 9 % slope.
  2. 02Two levels, 8.8 ft apartThe lower lawn sits 8.8 ft below the patio on the other side of the house.
  3. 03The old pool, measuredIt shows in the scan as an open void about 26 × 13 ft, inside the outline of the new pool.
VIZYON Design Group Design by our sister studio. The images in this band are renders: the yard before it existed.
02

Design

The yard, before it existed.

VIZYON took the scan and drew the yard on top of it: the pool, the levels, the walls, where the sun falls at six in the evening. The family saw it, walked through it on screen and changed it before a single shovel went in.

The design went through two rounds of revisions before the build began.

They needed space, so the answer was the land itself: thoughtful use of it, to extend the home's livable space.
Rob Healy, lead designer, VIZYON
The design drawn over the scan, seen from above
Render of the design from above: the pool, patios, pergola and planting
Render of the design: the pergola, the raised spa deck and the pool
Render of the design at night, with the lights on

Render and reality

The same view, before and after.

Drag the line, or use the arrow keys
The render of the back of the house and the yard
The finished yard at dusk from the same spot
Render · VIZYON Built · PSW ⇆
03

Build

Built from November to summer.

PSW built it from November 2025 to summer 2026, with Josh Himme as project director. The existing vinyl-liner pool stayed and was refurbished: new concrete and coping around it, then a new liner. Beyond it went the patios, the fire pit, the outdoor kitchen and the pergola, with heaters and screens. A new spa sits on a raised deck and a dining deck sits beside the pond, both with cable rails. Then came the planting, and out front a new entrance: steps, pavers and pillars.

The old deck and surround broken out around the existing pool
3 Nov 2025

Demolition

Demolition began on 3 November. By the next day the old surround was down to subgrade, and the existing pool stayed in place.

Forms set for the new concrete deck and coping
6 Nov 2025

Forms around the pool

With the ground open, the pool got an automatic cover, a new light, a new skimmer and new plumbing. Then the forms and gravel went in for the new deck and coping.

The new deck and coping poured around the pool
13 Nov 2025

New concrete and coping

A concrete collar went in on 12 November and the new coping on the 13th. The spa's new concrete pad was poured the same week.

The worn liner removed so the pool can be refurbished
14 Nov 2025

The old liner comes out

With the coping on, the worn liner came out, ready for a new one.

Patio base and pavers against a boulder wall
24 Nov 2025

The retaining wall and patios

A retaining wall and boulders went in, with lights set in the wall and a drain behind it. The pavers and porcelain followed up to it, and the fire pit area was paved.

The outdoor kitchen's block frame under protective sheeting
9 Dec 2025

The outdoor kitchen frame

The kitchen's block frame went up under sheeting in the first week of December, and the cabinets went in on the 9th. The tile followed in March, the fridge and lights in May.

Plants set out by the pond and the new pavers
5 May 2026

Planting by the pond

The plants arrived at the end of April and went in on 5 May. Three days later came the fire pit, the mulch and the landscape lighting.

The new liner in and the pool filled
8 Jun 2026

New liner and water

The new liner went in on 7 June and the pool was filled, framed by the new paver deck.

28 × 14 ftPool, as designed
6.0 × 5.9 ftSpa, as designed
8,385 sq ftArea of new work
10Plant varieties
04

Finished

The yard, lived in.

Step pavers cross black river rock to the dining deck, the loungers face the pool, and the pond beside the deck holds lilies and fish. As evening comes, the house lights come on and the whole yard reads as one place from the far end of the lawn.

The pool, with step pavers over black river rock leading to the dining deck
Loungers along the pool and step pavers in black river rock
Planting by the pond, with the fire pit seating beyond
The pool and loungers beyond the planting at sunset
Koi and lilies in the pond beside the deck
The house and yard at dusk from the far end of the lawn
It feels more functional, comfortable, and truly like an extension of our home and our lifestyle. We’re not just looking at a beautiful space anymore—we’re actually living in it, entertaining in it, relaxing in it, and enjoying all the little details that went into making it ours.
The homeowners, Bridgeville

Scan

VIZYON Design Group

Trimble LiDAR site capture

Rob Healy

Design

VIZYON Design Group

Rob Healy, lead designer

Design with VIZYON

Build

PSW

Josh Himme, project director

Photography: Yousef Hassoud

Your project

Every project starts with the ground.

Tell us how you want to live outdoors. We will start with your yard as it is.